top of page

Initiative 26-01: Strawberry Run Loop Connector

Our first initiative for the year 2026 completes pedestrian access along the 5-mile Strawberry Festival loop by connecting Old Mill to Academy Street with a safe, non-vehicle path.

This initiative focuses on completing the pedestrian and cyclist connection between Old Mill and Academy Street, a key missing link in the 5-mile Strawberry Festival loop. By closing this gap, the entire route will be accessible by sidewalk or non-vehicle path—improving safety, promoting active transportation, and enabling full loop access to the Police Station for residents and bike patrol officers alike. The proposed route follows town-owned land and sewer easements where possible and is designed with safety and snow storage in mind by setting the pathway back from Route 236.

Power in Numbers

Programs

Locations

Volunteers

Project Gallery

  • Instagram
  • Facebook
  • LinkedIn

© 2025 by Wicks Collective

bottom of page